Test #00-006, I shoring on the DCETF and DCT

DAMAGE CONTROL ENGINEERING TEST FACILITY

(DCETF)
NAVAL RESERVE CENTER, BALTIMORE
TEST DATA

TEST NUMBER: 00-006 DATE: 7/20/00
TEST TITLE: I shoring on the DCETF and DCT
RESULTS: Conducted an I shoring on D1/OH1 and D1/OH2 damage in compartment D1 area of the DCETF. The total time to construct each shoring for each damage was about 8 to 9 minutes. The time was calculated by adding one minute to measure and lay out for 3 cuts on each damage. Two minutes per cut and 1 to 2 minutes to perform the shoring. The total time for an I shoring on C1/SD1 in the DCT was about 23 to 25 minutes. This shoring had 9 cuts. STATUS: Completed Phase 1
TEST TEAM: 3 man team on each shoring
EQUIPMENT NAME: I shoring
EQUIPMENT MANUFACTURER:
PHONE:
AGENT:
PHONE:
FAX:
DESCRIPTION OF TEST: Time was measured while an I shoring was constructed on D1/OH1-2 and C1/SH1 damages. First the shoring was measure and lay out for cuts. Then 3 cuts were performed on each shoring in the D1 area and 9 cuts in the C1 of the DCT. After all the cuts were perform a team of 3 constructed the shoring in place.